Our Projects Mustang Extreme > Projects Select Application Environmental Containment Site Access Water Services Select Industry Agriculture Coal Ash Landfill Mining Oil & Gas Recreation Transmission & Distribution Submit Steel Panel Bridge Improves Load Rating of an Exiting bridge for Transmission Line Access in a Rural Community on the Ohio and Kentucky Boarder View Project Fast-Deploy Temporary Bridge Installed in Little Over 1 Hour Saves More than 6 Months in Permitting Time and Project Delays View Project 5-layer Produced Water Pond Total 2.7 Million SF View Project Crane Mats with a Composite Mat Cover Create a Safe, Efficient Stream Crossing for Indianapolis Power and Light View Project Texas Freshwater Fisheries Center Gets a Stunning New Aquaria in Athens Texas View Project Mustang Sends 4 More Temporary Bridges to Maui to Assist in Fire Recovery Efforts View Project Underdrain Installation Resolves Water Seepage Issues View Project Composite Mat Road Replaces Decaying Wood Mats at Data Center Site Build in Northern VA View Project Damage to Liner and Hoses Caused by Animals is Expertly Repaired View Project Helping Kiewit Optimize Cost Through Thoughtful Planning and Execution View Project Heavy-Duty Composite Mats Meet Challenges of Inclement Weather and Sensitive Terrain View Project Mustang Hybrid Bridge Solves Issues with Permitting Hold Ups View Project A Series of Ponds are Installed at an Innovative Farming Operation View Project A Soybean Tank Farm Gets a Custom-fitted Spill Containment System View Project Composite Mats Provide Safe Site Access for Utility Repairs with Minimal Disruption to Residents View Project Innovative Early Childhood Learning Center Gets a Hand-Made Playground. View Project Mustang Crews are Cross-Trained to Handle any Project View Project A Half Mile of Composite Mats Provide Access Through the Mud for Substation Installation Work View Project Custom Heater Huts Help Mitigate Costly Damage from Winter Weather Conditions View Project Custom Leak Detection Systems Help Preserve Municipal Water Resources View Project Landfill Expansion Completed in North Carolina View Project 500,000 BBL Freshwater Pond Completed in 4 1/2 Days View Project Major Renovation of a Fish Hatchery in South Texas View Project Environmental Liner Crews Install Over 4.5 million Sqft of Liner on Two Mining Projects View Project Custom Aeration Water Treatment System Completed on Dual, 500,000 BBL Ponds in Midland View Project Employee Safety Management While Working in Confined Spaces View Project Multiple Mobilizations and “Leapfrogging” Composite Mats Keep Project on Budget and on Schedule View Project Fast Deploy Skidder Bridge Provides Safe Access in Graham Texas View Project Mustang Extreme Crews Work 26 Active Job Sites Across 3 States in 1 Week View Project Composite Mats Keep Equipment Out of the Mud and Two Projects on Schedule View Project Protective Drainage and Containment System Created for a Logistics Company View Project Custom Subsurface Aeration System for and 80,000 BBL AST View Project Dump and Wash Ponds Installation View Project Private Ranch Pond in Sutherland Springs, Texas View Project The Mustang Extreme Crew Shows Off Their Craftsmanship View Project Solid Waste Landfill Installation View Project 1.5 Million SQFT of Liner Installed at a Power Plant in Texas View Project Remote Water Monitoring System Cuts Field Operations Expenses View Project Temporary Composite Mat Road Installation Through Densely Wooded Job Site View Project AST Installation to Support the Michigan Gathering System View Project Ranch Pond Installation in Wimberly, Texas View Project Cell Installation at a Solid Waste Landfill in Fayette View Project Geocomposite Liner Install for an Energy Waste Landfill in New Mexico View Project Despite Snow, Rain and High Winds Mustang Crews Complete 14-acre, Multi-layer Landfill Installation Ahead of Schedule View Project Private, Recreational Ranch Pond Installation View Project Composite Mats with Geotextile Fabric Underlayment Used to Create Compliant Frac Pad in Pennsylvania View Project Geosynthetic Lining Installation at a Mining Site in the Southwest U.S. View Project Fast-Deploy Temporary Skidder Bridges for Sewer Project in Union County, NC View Project Composite Mats Used to Create Access Road Through a Proctor & Gamble Property View Project 2.7 million Sq. Ft. of Geosynthetic Liner Installed for a Landfill Expansion Project View Project Prefabricated Bridge Installation Over Two Waterways for a Power Transmission Project View Project Refinery Retention Pond Installation in Tulsa, Oklahoma View Project 330,000 Sq. Ft. Produced Water Pond Installation in South Texas View Project 1.6 million sq. ft. of Geosynthetic Liner Used at 22 Fish Hatchery Ponds for Texas Parks & Wildlife Department View Project Composite Matting Installation for Precision Drill Rig Platform at Cornell University View Project Environmental Liner Installed to Create Freshwater Pond in Encinal, Texas View Project 25-Acre Cell Cap Installation at Louisiana Landfill View Project Composite Mats Used for Temporary Roadway Installation to a Remediation Site View Project Site Access Mats for Emergency Power Line Repair View Project Environmental Liner Installation at an Aging Petrochemical Plant View Project